This project will connect existing SW Meade St and the new SW Bond Ave, which is currently under construction. Phase one of the project includes the removal/disposal of 2500 tons of contaminated soil, placement of demarcation fabric to separate the existing soil from the new 15,000 tons of clean fill material. Two ultra-block walls were constructed ranging in height form 12 feet tall to 22 feet tall. A six foot surcharge will ensure the ground is adequately compacted for the future utilities and roadway which will happen in phase two.